NO DOWN TIME
We can work on your stations while keeping them in operating order so you don’t have down time and lose valuable profit.
CUSTOMIZED TO FIT ANY PUMP ISLAND
We will perform a complete on site survey and develop a site specific quotation.
COMPETITIVE PRICING
Our system is the most economical solution in the market today.
BEFORE
Crew will arrive in the morning and begin preparing the site for the custom reimaging work to begin.
DURING
Cuts are made 2″ – 4″ away from existing island and the stainless steel is set and fit into place. The existing island concrete is treated with a liquid bonding agent and the 4000 pound compression strength concrete is poured over the entire island creating a 2″ capover of new concrete.
AFTER
Site is cleaned-up and cones are set to guard wet concrete as well as protect customers. Forms are stripped, dispensers wiped down and final clean-up is finished in the morning. Your customers are still able to access the pumps to dispense gasoline the entire time the work is being completed. Each pump is shut-down for only 10 – 30 minutes each depending on the size of the island.
COMMON ISSUES
Paint Chipping
Concrete Deteriorating
Rust/Corrosion
Lost Sales/Poor Image
PROTECTS AGAINST
Gasoline and Oils
Salt
Chemicals
Rust
Corrosion
Extreme Weather
Heat
Staining
CLICK IMAGE TO OPEN GALLERY
